EWI 5 Assembly exercises on building mains feeds and meter cabinets

EWI 5 Assembly exercises on building mains feeds and meter cabinets

These assembly exercises focus on mechanical skills. All exercises are of an extremely practical nature. All parts, except for consumables (wires) can be reused. The following exercises are performed in this course:

  • Configuration, assembly and wiring of a meter board with sub-distribution

  • Installation of a digital meter

  • Installation of RCDs, line circuit breakers, etc.

  • Simple installation circuits in supply entry rooms

 
Equipment set comprising the following:
1
Meter cabinet set
Meter cabinet set SE2671-4A
1
Set of installation circuits
Set of installation circuits SE2671-4B
1
Set of fastening materials
Set of fastening materials SE2670-1J
1
Set of wiring materials, EWI 1-2
Set of wiring materials, EWI 1-2 SE2670-1M
1
Set of fixing materials, cables
Set of fixing materials, cables SE2670-1G
Media:
1
Manual EWI 5 Planning and installation of building mains feed
Manual EWI 5 Planning and installation of building mains feed SH5001-3D
Power supply:
1
Adapter box, three-phase / 4mm
Adapter box, three-phase / 4mm SE2661-9R
Measuring instruments:
1
Voltage, phase + continuity tester with field direction indicator, max. 400V
Voltage, phase + continuity tester with field direction indicator, max. 400V LM8554
1
Multi13S digital multimeter
Multi13S digital multimeter LM2330
Accessories:
1
Storage tray for SE boxes, reinforced, for 10 boxes
Storage tray for SE boxes, reinforced, for 10 boxes ST7004-2B
2
Storage tray for installation materials I, reinforced base
Storage tray for installation materials I, reinforced base ST7004-2J
1
Set of fixing materials, punched hole frame
Set of fixing materials, punched hole frame SE2669-3A
1
Set of fixing materials, punched hole frame (100pcs)
Set of fixing materials, punched hole frame (100pcs) SE2669-3C
1
Set of tools ''Electric ''
Set of tools ''Electric '' SE2670-4B
5
Safety measurement cable (4mm), 100cm, black
Safety measurement cable (4mm), 100cm, black SO5126-8V
1
Safety measurement cable (4mm), 100cm/40", blue
Safety measurement cable (4mm), 100cm/40", blue SO5126-9A
1
Safety measurement cable (4mm), 100cm, green/yellow
Safety measurement cable (4mm), 100cm, green/yellow SO5126-9C
1
Mobile aluminium experiment stand, 3 levels, power strip with 6 sockets, 1250x700x1995mm
Mobile aluminium experiment stand, 3 levels, power strip with 6 sockets, 1250x700x1995mm ST7200-3A
1
Punched hole panel, interchangeable, for 1200mm panel mounting frames
Punched hole panel, interchangeable, for 1200mm panel mounting frames ST8003-5Q

Alternative Montagemöglichkeit: 

1
Punched hole wiring installation cabin kit, 3 sides + roof, inside 1.2 x 1.2 x 2.0
Punched hole wiring installation cabin kit, 3 sides + roof, inside 1.2 x 1.2 x 2.0 ST8003-6C
1
Ergo45° 3 HU power duct, 580 mm, for twin wiring installation cabin, horizontal 114 PU
Ergo45° 3 HU power duct, 580 mm, for twin wiring installation cabin, horizontal 114 PU ST8033-3U
1
Full-width front plate (type 1) for six-sided power supply duct 114PU
Full-width front plate (type 1) for six-sided power supply duct 114PU ST8070-4C