In mains synchronization, the unloaded generator is connected to the mains power grid. Voltage, frequency and phase-angle have to coincide with the corresponding variable on the mains power grid. To measure these variables, a variety of different measuring instruments are used. The variables are set by means of the generator speed and generator excitation.

Training contents:

  • Manual mains synchronization is performed using the bright method, dark method and three-lamp synchronization circuits
  • Mains synchronization using the two-range frequency meter, two-range voltmeter, Synchronoscope and zero-voltage meter
  • Influence of generator speed
  • Influence of generator excitation
  • Adjusting energy flow by means of the drive