EEM 5.2-3 Mains (grid power) synchronisation 300W

EEM 5.2-3 Mains (grid power) synchronisation 300W

Training objectives:

  • Design and connection of the synchronizing circuit
  • Comparison of bright, dark and three-lamp synchronizing circuit
  • Mains synchronisation with double frequency meter, double voltage meter, synchronoscope and zero-voltage meter