EPH 3.2 Configuration of photovoltaic systems to operate in parallel with the electricity grid

EPH 3.2 Configuration of photovoltaic systems to operate in parallel with the electricity grid

Training contents:

  • Installation of photovoltaic systems
  • Set-up and testing of a photovoltaic system with feed to the electricity power grid
  • Measurement of energy generated by photovoltaic systems
  • Maximum Power Point (MPP) Tracking
  • Limiting the power of the photovoltaic inverter (derating)
  • Provision in reactive power
  • Determining the efficiency of the power grid inverter
  • Response to control of the power grid inverter
  • Recording output data using sun passage emulator
  • Investigating the response of a photovoltaic system when there is a power outage on the grid
  • Lightning protecting for photovoltaic systems
  • Economic benefits of photovoltaic systems
Basic equipment set, consisting of: 
1
Solar panel emulator, 1.5 kW, 500 V
Solar panel emulator, 1.5 kW, 500 V CO3208-1P
1
3-phase industrial photovoltaic inverter
3-phase industrial photovoltaic inverter CO3208-1N
1
Variable Ohmic load, three-phase, 1kW
Variable Ohmic load, three-phase, 1kW CO3301-3F
Media:
1
Interactive Lab Assistant: Professional Photovoltaic Systems
Interactive Lab Assistant: Professional Photovoltaic Systems SO2800-3G
Software:
1
Software SCADA Viewer
Software SCADA Viewer SO4001-3H
1
Patch cable Cat5E 1x 1m yellow, 2x 2m yellow
Patch cable Cat5E 1x 1m yellow, 2x 2m yellow LM9057
1
USB Network Adapter 10/100 BaseTX RJ45
USB Network Adapter 10/100 BaseTX RJ45 LM9056
1
5-Port Ethernet Switch
5-Port Ethernet Switch LM9988
Power supply:
1
Universal power supply for electrical machines
Universal power supply for electrical machines CO3212-5U
1
Multiple socket outlet, 6 fold, with illuminated switch
Multiple socket outlet, 6 fold, with illuminated switch ST8010-4J
Measuring instruments:
1
Digital/analog multimeter, wattmeter, power-factor incl. software
Digital/analog multimeter, wattmeter, power-factor incl. software CO5127-1Z
1
Three-phase power quality meter, display and long-term memory
Three-phase power quality meter, display and long-term memory CO5127-1S
Accessories:
1
Double busbar unit, three-phase, incoming / outgoing feeder
Double busbar unit, three-phase, incoming / outgoing feeder CO3301-5R
20
Safety connecting plug 4mm with tap (2x), black, 1000V/32A CAT II
Safety connecting plug 4mm with tap (2x), black, 1000V/32A CAT II SO5126-3R
5
Safety connecting plug 4mm with tap (2x), blue, 1000V/32A CAT II
Safety connecting plug 4mm with tap (2x), blue, 1000V/32A CAT II SO5126-3V
5
Safety connecting plug 4mm with tap (2x), green/yellow, 1000V/32A CAT II
Safety connecting plug 4mm with tap (2x), green/yellow, 1000V/32A CAT II SO5126-3W
1
Set of safety measurement cables, 4mm (31 leads)
Set of safety measurement cables, 4mm (31 leads) SO5148-1L
1
Mobile aluminium experiment stand, 3 levels, power strip with 6 sockets, 1250x700x1995mm
Mobile aluminium experiment stand, 3 levels, power strip with 6 sockets, 1250x700x1995mm ST7200-3A
1
Display for Professional Photovoltaics equipment
Display for Professional Photovoltaics equipment CO3301-7E
1
Protected power distribution for working stations
Protected power distribution for working stations ST8008-8N
1
Wall or aluminium-profile mounting cable storage for 48 cables
Wall or aluminium-profile mounting cable storage for 48 cables ST8003-8E
1
PC holder for SybaPro experiment trolleys, height/width adjustable
PC holder for SybaPro experiment trolleys, height/width adjustable ST7200-5F
1
Monitor holder for flat screen monitor of weight up to 15kg / 33lbs
Monitor holder for flat screen monitor of weight up to 15kg / 33lbs ST8010-4T
1
Keyboard adapter for flat screen monitor holders
Keyboard adapter for flat screen monitor holders ST8010-4G
1
Protection cover for three-level experiment trolleys
Protection cover for three-level experiment trolleys ST8010-9Y